|
|
|
|
|
|
|
![]() Picture 5: Attaching the Drawbridge (continued) Place the pewter (no lead) brackets over the pins on the sides of the drawbridge and screw into place. Make sure to push the screws in as you turn the screwdriver. DO NOT OVER-TIGHTEN! |
![]() Picture 6: Drawbridge with Installed Brackets |
![]() Picture 7: Assembling the Winch Place the second support bracket onto the end of the winch assembly. DO NOT GLUE |
![]() Picture 8: Assembling the Winch (continued) Glue (using a gel-type Super Glue - not provided ) the winch support brackets onto the roof of the gate wall, where indicated by the two solid lines. We recommend using a glue accelerant.Set aside to dry. |
![]() Picture 9: Install the chains Drop the chains through the drilled holes in the roof. Pull the chain through the front passageway. |
![]() Picture 10: Attaching the Chains (continued) Push the cotter pin through the hole in the deck of the drawbridge and spread the legs of the cotter pin to secure the chain. Repeat for the other chain. Your drawbridge is now ready to operate. Use the stump block to wedge the 5-spoked handle when the drawbridge is raised. |